" Said parties of the second part are to furnish all the plant, tools, appliances, labor and materials for filling with gravel, as hereinafter specified, portions of certain streets on South Boston Flats, as follows : D and E streets from the southerly... "
Annual Report of the Harbor and Land Commissioners, for the Year ... - Side 57
av Board of Harbor and Land Commissioners of Massachusetts - 1894
Uten tilgangsbegrensning - Om denne boken

Public Documents of Massachusetts, Volum 12

Massachusetts - 1899 - 1246 sider
...feet therefrom, the inner ends of said jetties to extend to above high-water mark, as shown on the plan on file in the office of the Board of Harbor and Land Commissioners marked " Plan of Menamsha Inlet, showing proposed Jetties for protecting its banks, July, 1807," signed...
Uten tilgangsbegrensning - Om denne boken

Annual Report of the Board of Harbor and Land Commissioners. For ..., Volum 18

Board of Harbor and Land Commissioners of Massachusetts - 1897 - 108 sider
...of the wharf, one 150 feet and one 400 feet north-easterly from the northerly corner of the wharf. A plan on file in the office of the Board of Harbor and Land Commissioners, marked, " Plan of proposed wharf on South Boston flats, September, 1896," signed by Frank W. Hodgdon,...
Uten tilgangsbegrensning - Om denne boken

Annual Report

1885 - 316 sider
...conditions : — Said foundations are to be built as shown by Figure No. 1, or by Figure No. 2, on a Plan on file in the office of the Board of Harbor and Land Commissioners, marked "South Boston Flats Sewers, G, August, 1886." The location and length of each kind of foundation...
Uten tilgangsbegrensning - Om denne boken

Annual Report

1891 - 282 sider
...Street easterly to the seawall on the northerly side of the Reserved Channel, on the South Boston Flats, reference being had for the location thereof to a...of the Board of Harbor and Land Commissioners. The length of street to be filled is about 2,000 feet. The depth of the gravel filling to be about 3 feet....
Uten tilgangsbegrensning - Om denne boken

Public Documents of Massachusetts, Volum 12

Massachusetts - 1894 - 718 sider
...Congress Street, and Cypher, Claflin, Danby, Egraont and Fargo streets and Mt. Washington Avenue from С Street to D Street and from D Street to E Street,...other streets are to be 50 feet wide on top at grade IG. The aggregate length to be filled of all the 50 feet streets is about 6,700 feet. The depth of...
Uten tilgangsbegrensning - Om denne boken

Annual Report

1894 - 298 sider
...the southerly line of Congress Street, and Cypher, Claflin, Danby, Egmont and Fargo streets and Mr, Washington Avenue from C Street to D Street and from...office of the Board of Harbor and Land Commissioners. 60 HARBOR AND LAND COMMISSIONERS. [Jan. The portions of D and E streets to be filled are each 2,400...
Uten tilgangsbegrensning - Om denne boken

Public Documents of Massachusetts, Volum 12,Del 1

Massachusetts - 1897 - 792 sider
...second about 450,100 square feet. The location and dimensions of both areas are more exactly shown on a plan on file in the office of the Board of Harbor and Land Commissioners, entitled "Plan of areas to be dredged off Grand Junction wharves, East Boston. May, 1896. Scale, flu."...
Uten tilgangsbegrensning - Om denne boken

Annual Report

1898 - 404 sider
...about 200 feet. The exact location, size, and method of construction of said jetties are fully shown on a plan on file in the office of the Board of Harbor and Laud Commissioners, entitled " Plan of proposed jetties at Green Harbor, Marshfield, Mass., July, 1898,"...
Uten tilgangsbegrensning - Om denne boken

Annual Report of the Board of Harbor and Land Commissioners. For ..., Volum 20

Board of Harbor and Land Commissioners of Massachusetts - 1899 - 124 sider
...feet therefrom, the inner ends of said jetties to extend to above high-water mark, as shown on the plan on file in the office of the Board of Harbor and Land Commissioners marked " Plan of Menamsha Inlet, showing proposed Jetties for protecting its banks, July, 1897," signed...
Uten tilgangsbegrensning - Om denne boken

Annual Report

Board of Harbor and Land Commissioners of Massachusetts - 1900 - 126 sider
...platform is to be built of oak piles, with rough oak braces and hard pine timber. A series of six plans on file in the office of the Board of Harbor and Land Commissioners marked " Platform for New Pier, South Boston Flats, January, 1899," and signed by Frank W. Hodgdon,...