project, heretofore authorized in section 9 of the Flood Control Act of December 22, 1944 (58 Stat. 887), as modified by the report of the Secretary of the Interior contained in House Document Numbered 325, Eighty-sixth Congress, second session, is confirmed and approved under the designation “Garrison diversion unit,” and the construction of a development providing for the irrigation of two hundred and fifty thousand acres, municipal and industrial water, fish and wildlife conservation and development, recreation, flood control, and other project purposes shall be prosecuted by the Department of the Interior substantially in accordance with the plans set out in the Bureau of Reclamation report dated November 1962 (revised February 1965) supplemental report to said House Document Numbered 325.

SEC. 2. (a) Subject to the provisions of subsections (b), (c), (d), and (e) of this section, the Secretary is authorized in connection with the Garrison diversion unit (i) to construct, operate, and maintain or provide for the construction, operation, and maintenance of public outdoor recreation and fish and wildlife enhancement facilities, (ii) to acquire or otherwise to include within the unit area such adjacent lands or interests in land as are necessary for present or future public recreation or fish and wildlife use, (iii) to allocate water and reservoir capacity to recreation and fish and wildlife enhancement, and (iv) to provide for the public use and enjoyment of unit lands, facilities, and water areas in a manner coordinated with other unit purposes. The Secretary is further authorized to enter into agreements with Federal agencies or State or local public bodies for the operation, maintenance, and replacement of unit facilities, and to transfer unit lands or facilities to Federal agencies or State or local public bodies by lease or exchange, upon such terms and conditions as will best promote the development and operation of such lands or facilities in the public interest for recreation and fish and wildlife enhancement purposes.

(b) All costs allocated to fish and wildlife enhancement and incurred in connection with waterfowl refuges and waterfowl production areas proposed for Federal administration shall be nonreimbursable.

(c) (1) If, before commencement of construction of the unit, non-Federal public bodies agree to administer for recreation or fish and wildlife enhancement or for both of these purposes pursuant to the plan for the development of the unit approved by the Secretary, land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the separable costs of the unit allocated to either or both of said purposes, as the case may be, and attributable to such areas and all the costs of operation, maintenance, and replacement incurred in connection therewith, the remainder of the separable capital costs so allocated and attributed shall be nonreimbursable.

(2) In the absence of such a preconstruction agreement, recreation and fish and wildlife enhancement facilities (other than minimum facilities for the public health and safety at reservoir access points and facilities related to Federal waterfowl refuges and waterfowl production areas) shall not be provided, and the allocation of unit costs shall reflect only the number of visitor days

and the value per visitor day estimated to result from such diminished recreation development without reference to lands which may be provided pursuant to subsection (e) of this section.

(d) The non-Federal share of the separable capital costs of the unit allocated to recreation and fish and wildlife enhancement shall be borne by non-Federal interests, under either or both of the following methods as may be determined appropriate by the Secretary: (i) payment, or provision of lands, interests therein, or facilities for the unit; or (ii) repayment, with interest, within fifty years of first use of unit recreation or fish and wildlife enhancement facilities: Provided, That the source of repayment may be limited to entrance and user fees or charges collected at the unit by non-Federal interests if the fee schedule and the portion of fees dedicated to repayment are established on a basis calculated to achieve repayment as aforesaid and are made subject to review and renegotiation at intervals of not more than five years.

(e) Nothwithstanding the absence of preconstruction agreements as specified in subsection (C) of this section lands may be acquired in connection with construction of the unit to preserve the recreation and fish and wildlife enhancement potential of the unit.

(1) If non-Federal public bodies agree within ten years after initial unit operation to administer for recreation and fish and wildlife enhancement pursuant to the plan for development of the unit approved by the Secretary land and water areas which are not included within Federal waterfowl refuges and waterfowl production areas and to bear not less than one-half the costs of lands acquired therefor pursuant to this subsection and facilities and project modifications provided for those purposes and all costs of operation, maintenance, and replacement incurred therefor, the remainder of the costs of such lands, facilities, and project modifications shall be nonreimbursable. Such agreement and subsequent development shall not be the basis for any allocation of joint costs of the unit to recreation or fish and wildlife enhancement.

(2) If, within ten years after initial operation of the unit, there is not an executed agreement as specified in paragraph (1) of this subsection, the Secretary may utilize the lands for any lawful purpose within the jurisdiction of the Department of the Interior, or may transfer custody of the land to another Federal agency for use for any lawful purpose within the jurisdiction of that agency, or may lease the lands to a non-Federal public body, or may transfer the lands to the Administrator of General Services for disposition in accordance with the surplus property laws of the United States. In no case shall the lands be used or made available for use for any purpose in conflict with the purposes for which the project was constructed, and in every case preference shall be given to uses which will preserve and promote the recreation and fish and wildlife enhancement potential of the project or, in the absence thereof, will not detract from that potential.

(f) Subject to the limitations hereinbefore stated, joint capital costs allocated to recreation and fish and wildlife enhancement shall be nonreimbursable.

(g) Costs of means and measures to prevent loss

as

of and damage to fish and wildlife shall be treated as unit costs and allocated among all unit purposes.

(h) As used in this Act, the term "nonreimbursable" shall not be construed to prohibit the imposition of entrance, admission, and other recreation user fees or charges.

Sec. 3. The Garrison diversion unit shall be integrated physically and financially with the other Federal works constructed or authorized to be constructed under the comprehensive plan approved by section 9 of the Act of December 22, 1944, as amended and supplemented. The Secretary shall give consideration to returning to the Missouri River to the fullest extent practicable such of the return flows as are not required for beneficial purposes.

SEC. 4. (a) The interest rate used for computing interest during construction and interest on the unpaid balance of the capital costs allocated to interest-bearing features of the Garrison diversion unit as authorized in this Act shall be determined by the Secretary of the Treasury as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of issue.

(b) From and after July 1, 1965, the interest rate on the unamortized balance of the investment allocated to commercial power in facilities constructed or under construction on June 30, 1965, by

the Department of the Army in the Missouri River Basin, the commercial power from which is marketed by the Department of the Interior, and in the transmission and marketing facilities associated therewith, shall be 212 per centum per annum.

Sec. 5. For a period of ten years from the date of enactment of this Act, no water from the project authorized by this Act shall be delivered to any water user for the production on newly irrigated lands of any basic agricultural commodity, defined in the Agricultural Act of 1949, or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 301(b) (10) of the Agricultural Adjustment Act of 1938, as amended, unless the Secretary of Agriculture calls for an increase in production of such commodity in the interest of national security.

Sec. 6. There is hereby authorized to be appropriated for construction of the Garrison diversion unit as authorized in this Act, the sum of $207,000,000, plus or minus such amounts, if any, as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the types of construction involved herein. There are also authorized to be appropriated such additional sums as may be required for operation and maintenance of the unit.

Approved August 5, 1965.

21. Mid-State Division, Missouri River Basin Project, Nebraska

Act of Nov. 17, 1965, P.L. 90-136 (81 Stat. 444 et seq.)

AN ACT

To authorize the Secretary of the Interior to construct,

operate, and maintain the Nebraska Mid-State division, Missouri River Basin project, and for other purposes.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That the Secretary of the Interior is hereby authorized to construct, operate, and maintain in accordance with the Federal reclamation laws (Act of June 17, 1902 (32 Stat. 388), and Acts amendatory thereof or supplementary thereto) the Nebraska Mid-State division, Missouri River Basin project, Nebraska, for the principal purposes of furnishing a surface irrigation water supply for approximately one hundred and forty thousand acres of land, aiding in the replenishment of the ground water supply of the area for domestic and agricultural use, controlling floods, conserving and developing fish and wildlife, enhancing recreation opportunities, and producing hydroelectric power. The principal works of the project shall consist of a diversion dam on the Platte River, a main supply canal, an interconnected reservoir system, hydroelectric power facilities, wasteways, pumps, drains, canals, laterals, distribution facilities, and related works.

SEC. 2. The Nebraska Mid-State division shall be integrated, physically and financially, with the other Federal works in the Missouri River Basin constructed or authorized to be constructed under

the comprehensive plans approved by section 9 of the Act of December 22, 1944 (58 Stat. 891), as amended and supplemented, and shall be a division of the Missouri River Basin project therein approved and authorized.

Sec. 3. The interest rate used for computing interest during construction and interest on the unpaid balance of the capital costs allocated to interest-bearing features of the Nebraska Mid-State division shall be determined by the Secretary of the Treasury as of the beginning of the fiscal year in which construction is initiated, on the basis of the computed average interest rate payable by the Treasury upon its outstanding marketable public obligations, which are neither due nor callable for redemption for fifteen years from date of issue.

Sec. 4. For a period of ten years from the date of enactment of this Act, no water from the project authorized by this Act shall be delivered to any water user for the production on newly irrigated lands of any basic agricultural commodity, as defined in the Agricultural Act of 1949, or any amendment thereof, if the total supply of such commodity for the marketing year in which the bulk of the crop would normally be marketed is in excess of the normal supply as defined in section 301(b) (10) of the Agricultural Adjustment Act of 1938, as amended, unless the Secretary of Agriculture calls for an increase in production of such commodity in the interest of national security.

Sec. 5. The provision of land, facilities, and project modifications which furnish outdoor recreation and fish and wildlife enhancement benefits in connection with the Nebraska Mid-State division shall be in accordance with the provisions of the Federal Water Project Recreation Act (79 Stat. 213).

SEC. 6. There is authorized to be appropriated for construction of the Nebraska Mid-State division as authorized in this Act, the sum of $106,135,000 (January 1967 price levels) plus or minus such amounts, if any, as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the types of construction involved herein. There are also authorized to be appropriated such additional

sums as may be required for operation and maintenance of the division.

Sec. 7. In order to assure repayment of the irrigation portion of this project, no funds shall be appropriated for construction nor shall any construction be started until firm and binding contracts have been signed by the owners of the full one hundred and forty thousand acres of land to be irrigated from waters furnished by the Mid-State reclamation project, said contracts to be certified by the Mid-State Board of Directors.

Approved November 14, 1967.

22. Pecos River Basin

Act of September 12, 1964, P.L. 88–594 (78 Stat. 942)

JOINT RESOLUTION

Authorizing the Secretary of the Interior to carry out a

continuing program to reduce nonbeneficial consumptive use of water in the Pecos River Basin, in New Mexico and Texas.

beneficiaries will repay the United States so much of the reimbursable costs incurred by it in carrying out such program as do not exceed the value of the benefits accruing to such beneficiaries from such program. The Secretary shall not require the repayment of such costs unless he determines that it is feasible (1) to identify the beneficiaries that are directly benefited by the program, and (2) to measure the extent to which each beneficiary is benefited by such program.

Resolved by the Senate and House of Representatives of the United States of America in congress assembled, That in order to prevent further decreases in the supply of water in the Pecos River Basin, and in order to increase and protect such water supply for municipal, industrial, irrigation, and recreational uses, and for the conservation of fish and wildlife, and to provide protection for the farmlands in such basin from the hazards of floods, the Secretary of the Interior (hereinafter referred to as the "Secretary") is authorized and directed to take such measures as he deems necessary and appropriate to carry out a continuing program to reduce the nonbeneficial consumption of water in the basin, including that by salt cedar and other undesirable phreatophytes. Such program shall be carried out in the Pecos River Basin from its headwaters in New Mexico to the town of Girvin, Texas: Provided, however, That no money shall be appropriated for and no work commenced on the clearing of the floodway authorized by the Act of February 20, 1958 (72 Stat. 17), unless provision shall have been made to replace any Carlsbad Irrigation District terminal storage which might be lost by the clearing of said floodway.

(b) Repayment contracts entered into pursuant to the provisions of this section shall be subject to such terms and conditions as the Secretary may prescribe, except that the amount of the repayment installment and total obligation in the case of any beneficiary shall be fixed by the Secretary in accordance with the ability of such beneficiary to pay, taking into consideration all other financial obligations of such beneficiary.

(c) Any costs of the program which the Secretary determines are properly allocable to flood control, fish and wildlife conservation and development, recreation, or restoration of streamflow shall be considered as nonreimbursable costs.

(d) In conducting the program, the Secretary shall take such measures as may be necessary to insure that there will be no interference with regular streamflow, no contamination of water, and the least possible hazard to fish and wildlife resources.

SEC. 2. As a condition to undertaking the program authorized by the first section of this joint resolution, the Secretary shall require the States of New Mexico and Texas to give such assurances as he deems adequate that such States will acquire such lands, easements, rights-of-way, and other interests in lands as the Secretary considers necessary effectively to carry out such program.

Sec. 4. Nothing contained in this joint resolution shall be construed to abrogate, amend, modify, or be in conflict with any provisions of the Pecos River compact.

Sec. 3. (a) As a further condition to undertaking the program authorized by this joint resolution, the Secretary may, with respect to those beneficiaries in New Mexico and Texas which the Secretary determines to be likely to benefit directly from the results of such program, require such commitments as he deems appropriate that such

Sec. 5. There is hereby authorized to be appropriated not more than $2,500,000 for the initial eradication or suppression of salt cedar and other undesirable phreatophytes on lands within the area to which this joint resolution applies and, in addition thereto, such further sums as may be necessary to maintain continued control over this land to prevent its reinfestation.

Approved September 12, 1964.

23. Trinity River Division, Central Valley Project, California

Act of August 12, 1955, P.L.84-386 (69 Stat. 719)

AN ACT

To authorize the Secretary of the Interior to construct,

operate, and maintain the Trinity River division, Central Valley project, California, under Federal reclamation laws.

Be it enacted by the Senate and House of Representatives of the United States of America in Congress assembled, That, for the principal purpose of increasing the supply of water available for irrigation and other beneficial uses in the Central Valley of California, the Secretary of the Interior, acting pursuant to the Federal reclamation laws (Act of June 17, 1902, 32 Stat. 388, and Acts amendatory thereof or supplementary thereto), is authorized to construct, operate, and maintain, as an addition to and an integral part of the Central Valley project, California, the Trinity River division consisting of a major storage reservoir on the Trinity River with a capacity of two million five hundred thousand acre-feet, a conveyance system consisting of tunnels, dams, and appurtenant works to transport Trinity River water to the Sacramento River and provide, by means of storage as necessary, such control and conservation of Clear Creek flows as the Secretary determines proper to carry out the purposes of this Act, hydroelectric powerplants with a total generating capacity of approximately two hundred thirty-three thousand kilowatts, and such electric transmission facilities as may be required to deliver the output of said powerplants to other facilities of the Central Valley project and to furnish energy in Trinity County: Provided, That the Secretary is authorized and directed to continue to a conclusion the engineering studies and negotiations with any nonFederal agency with respect to proposals to purchase falling water and, not later than eighteen months from the date of enactment of this Act, report the results of such negotiations, including the terms of a proposed agreement, if any, that may be reached, together with his recommendations thereon, which agreement, if any, shall not become effective until approved by Congress. The works authorized to be constructed shall also include a conduit or canal extending from the most practicable point on the Sacramento River near Redding in an easterly direction to intersect with Cow Creek, with such pumping plants, regulatory reservoirs, and other appurtenant works as may be necessary to bring about maximum beneficial use of project water supplies in the area.

SEC. 2. Subject to the provisions of this Act, the operation of the Trinity River division shall be integrated and coordinated, from both a financial and an operational standpoint, with the operation of other features of the Central Valley project, as presently authorized and as may in the future be authorized by Act of Congress, in such manner as will effectuate the fullest, most beneficial, and most economic utilization of the water resources hereby made available: Provided, That the Secretary is authorized and directed to adopt appropriate measures to insure the preservation and propagation of fish and wildlife, including, but not limited to,

the maintenance of the flow of the Trinity River below the diversion point at not less than one hundred and fifty cubic feet per second for the months July through November and the flow of Clear Creek below the diversion point at not less than fifteen cubic feet per second unless the Secretary and the California Fish and Game Commission determine and agree that lesser flows would be adequate for maintenance of fish life and propagation thereof; the Secretary shall also allocate to the preservation and propagation of fish and wildlife, as provided in the Act of August 14, 1946 (60 Stat. 1080), an appropriate share of the costs of constructing the Trinity River development and of operating and maintaining the same, such costs to be nonreimbursable: Provided further, That not less than 50,000 acre-feet shall be released annually from the Trinity Reservoir and made available to Humboldt County and downstream water users.

Sec. 3. The Secretary is authorized to investigate, plan, construct, operate, and maintain minimum basic facilities for access to, and for the maintenance of public health and safety and the protection of public property on, lands withdrawn or acquired for the development of the Trinity River division, to conserve the scenery and the natural, historic, and archeologic objects, and to provide for public use and enjoyment of the same and of the water areas created by these developments by such means as are consistent with their primary purposes. The Secretary is authorized to withdraw from entry or other disposition under the public land laws such public lands as are necessary for the construction, operation, and maintenance of said minimum basic facilities and for the other purposes specified in this section and to dispose of such lands to Federal, State, and local governmental agencies by lease, transfer, exchange, or conveyance upon such terms and conditions as will best promote their development and operation in the public interest. The Secretary is further authorized to investigate the need for acquiring other lands for said purposes and to report thereon to the Committees on Interior and Insular Affairs of the Senate and House of Representatives, but no lands shall be acquired solely for any of these purposes other than access to project lands and the maintenance of public health and safety and the protection of public property thereon without further authorization by the Congress. All costs incurred pursuant to this section shall be nonreimbursable and nonreturnable.

SEC. 4. Contracts for the sale and delivery of the additional electric energy available from the Central Valley project power system as a result of the construction of the plants herein authorized and their integration with that system shall be made in accordance with preferences expressed in the Federal reclamation laws: Provided, That a first preference, to the extent of 25 per centum of such additional energy, shall be given, under reclamation law, to preference customers in Trinity County, California, for use in that county, who are ready, able and willing, within twelve months after notice of availability by the Secretary, to enter into contracts for the energy: Provided further, That Trinity County preference customers may exercise their option on the same date in each successive fifth year providing written notice of their intention to use the energy is given to the Secretary not less than eighteen months prior to said date.

SEC. 5. The Secretary is authorized to make payments, from construction appropriations, to Trinity County, California, of such additional costs of repairing, maintaining, and constructing county roads as are incurred by it during the period of actual construction of the Trinity River division and as are found by the Secretary to be properly attributable to and occasioned by said construction. The Secretary is further authorized and directed to pay to Trinity County annually an inlieu tax payment out of the appropriations during construction and from the gross revenues of the project during operation an amount equal to the

annual tax rate of the county applied to the value of the real property and improvements taken for project purposes in Trinity County, said value be. ing determined as of the date such property and improvements are taken off the tax rolls. Payments to the public-school districts in the project area affected by construction activities shall be made pursuant to existing law.

SEC. 6. There are hereby authorized to be appropriated for construction of the Trinity River divi. sion $225,000,000, plus or minus such amounts, if any, as may be justified by reason of ordinary fluctuations in construction costs as indicated by engineering cost indexes applicable to the type of construction involved herein, and, in addition thereto, such sums as may be required to carry out the provisions of section 5 of this Act and to operate and maintain the said development.

Approved August 12, 1955.