EXHIBIT NO. 1.-Building trades wage rates, 8- hour day, prevailing Feb. 15, 1949 (compiled by Engineering News Record) Anderson, Ind. Jacksonville, Fla. Jamestown, N. Y Jefferson City, Mo. Nashville, Tenn, 42. 1.75 2.00 EXHIBIT NO. 1.-Building trades wage rates, 8-hour day, prevailing Feb. 15, 1949 (compiled by Engineering News-Record)-Continued 1 Up to 3 tons, over 3 tons, $1.50. 2 $18 per day. High speed over 3 stories. Outside, NOTE: Hourly rates are founded to the closest cent where fractional parts of cent are quoted. i $1.50-$1.80. EXHIBIT B.-Okinawa current need list (Feb. 18, 1949) Asbestos worker, at $1.875, qualified for structural insulation work, pipe covering, etc. Blacksmith, at $1.775. Boilermaker, at $1.95 (must have Hartford and State certification in good standing for low- and high-pressure repair work). Bricklayer, at $2.175_ Carpenters (35 on priority No. 1), at $1.75.. Electrician (priority No. 3), at $1.95; 2, motor-rewind experience. Glazier, at $1.625. Mechanic (priority No. 1), at $1.85; 7, extensive experience in motor rebuilding, repair and overhaul of Army ordnance vehicles, jeeps, weapon carriers, personnel carriers and 21⁄2-ton GMC cargo trucks or like commercial experience; 2, experienced mechanics who have thorough knowledge of parts or long experience in Army ordnance or engineer depots----Mechanics, at $1.85, minimum 5 years' experience overhauling and maintaining crushing equipment. Must have hand tools. Mechanics, H. E. (priority No. 1), at $1.85; 6, H. E. having heavy truck repair and contractor's equipment experience also qualified on Diesel equipment and engine rebuilding; 2, H. E. mechanics who have worked for contractors having extensive experience with caterpillar equipment.. Painter, brush, at $1.75 Pipe layer, C. I., at $1.375; 3, experienced in laying 16-inch diameter and ironpressure piping, capable of putting in good yarning and calking joints--Plumbers (priority No. 3), at $2_ Welder, certified, at $1.95, experienced welders having API certification for butt-welded "electric arc" steel petroleum storage tanks, and must be able to burn, chip, and fit... Operator, H. E., under three-fourths cubic yard, at $2_ Operator, H. E., over three-fourths cubic yard (priority No. 2), at $2.15, minimum 5 years' experience on crawlers, clamshells, dragline, shovel and/or backhoe machines, mainly Marion, Northwest, and BucyrusErie lines.. |