Sidebilder
PDF
[ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

WILLIAM BLACKWOOD AND SONS
ED IN BLR G H AND LONDON
MD C C C LIV

[ocr errors][merged small][ocr errors][merged small]
[ocr errors][ocr errors][merged small]
[merged small][ocr errors]
[ocr errors]

scnllery, - - ib. —, alternative plan for do., ib. —, front elevation of do., 8 —, end elevation of do., ib. —, one-roomed, method of arranging two beds in, 9 —, do., do., three beds, 10 , various designs for exterior elevations of, - - 11-13 —, placing of windows of, 14 —, internal conveniences, cupboards, cellars, &c., ib. Filters, sand, wool, clay, 31, 32 —, animal charcoal, 32 —, drawing of cistern, ib. —, portable, - • 33 —, domestic barrel, - - 34 'ireplaces, reflection of heat from 15 —, form of sides of, 16

[ocr errors]

AND CONVENIENCES.

Page Fireplaces, two kinds of heating surfaces required—heating and cooking, - - - - 16 —, method of economisingthe heat of, 17 , construction of heating chamber behind, . - • - ib. —, working drawings of clay or unburnt brick, . - 18 —, directions how to build, . ib. —, cottage, on the Staffordshire plan, with oven, - 19 —, working drawings, and instructions for building do., ib. —, with two ovens and hot-water boiler, . - - - - 20 Grates, materials of which they should be made, - - 15 Heat, radiant, combined, . - ib. Stoves, simple cottage, for cooking, constructed of brick, - 21 do. constructed of iron, - &b. — with oven and hot-plate, 22 , instructions how to build do., ib. Ventilation, supply of fresh air to apartments, - - - 23 —, withdrawal of foul air by, . 24 by chimney-flue, - - 25 Water, its qualities and contaminations, 27 , rain, its properties and value, ib. —, spring, its properties and value, 28 —, cistern for roadside spring, ib. , river and rivulet, - - ib. —, mechanical and chemical impurities of, . - - - ib. , purification of, by subsidence and filtration, - - 29 —, organic impurities in, ib.

[merged small][ocr errors][merged small][merged small][ocr errors][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors]

—, depth of trench for,

, proportions of, - -

—, points to be attended to in the
construction of, in various kinds

[ocr errors]

37

ib.

ib.

38

ib.

of - - - • -

Stone houses, rubble walls for, . 5

, coursed work for, - -

Stone-work, foundation for walls in,

, hollow walls for, -

Walls, thickness of, suitable

for

cottages, - - - -

[merged small][merged small][ocr errors][merged small][merged small]

, proportioning the depth, breadth,

and number of steps for, - ib.

, construction of a simple species

of, - - - - - 75

—, carriage, or string boards of, ib.
—, method of marking out the
position of steps in the carriage-

boards of, . - - - ib.
, arrangement of timbers in plat-

form, . - - - - 76

Tie-beam, method of joining a collar
with, . • - - - 65

[ocr errors][merged small]
[ocr errors]
[blocks in formation]
« ForrigeFortsett »