flight and to assure that people and facilities are not concentrated in areas susceptible to aircraft accidents; and

(2) Desirable restrictions on land use to assure its compatibility with the characteristics, including noise, of air installations operations;

(c) Describes the procedures by which Air Installations Compatible Use Zones (AICUZ) may be defined; and

(d) Provides policy on the extent of Government interest in real property within these zones which may be retained or acquired to protect the operational capability of active military airfields (subject in each case to the availability of required authorizations and appropriations).

§ 256.2 Applicability.

This part applies to air installations of the Military Departments located within the United States, its territories, trusts, and possessions.

§ 256.3 Criteria.

(a) General. The Air Installations Compatible Use Zone for each military air installation shall consist of (1) land areas upon which certain uses may obstruct the airspace or otherwise be hazardous to aircraft operations, and (2) land areas which are exposed to the health, safety or welfare hazards of aircraft operations.

(b) Height of obstructions. The land area and height standards defined in AFM 86-8,1 NavFac P-272 and P-80,1 and TM 5-803-41 will be used for purposes of height restriction criteria.

(c) Accident potential (1) General. (i) Areas immediately beyond the ends of runways and along primary flight paths are subject to more aircraft accidents than other areas. For this reason, these areas should remain undeveloped, or if developed should be only sparsely developed in order to limit, as much as possible, the adverse effects of a possible aircraft accident.

(ii) DoD fixed wing runways are separated into two types for the purpose of defining accident potential areas. Class A runways are those restricted to light

1 Filed as part of original. Copies available in the Office of the Assistant Secretary of Defense (Installations and Logistics)-ID, Washington, DC 20301.

aircraft (See §256.6) and which do not have the potential for development for heavy or high performance aircraft use or for which no foreseeable requirement for such use exists. Typically these runways have less than 10% of their operations involving Class B aircraft (§ 256.6) and are less than 8000 feet long. Class B runways are all other fixed wing runways.

(iii) The following descriptions of Accident Potential Zones are guidelines only. Their strict application would result in increasing the safety of the general public but would not provide complete protection against the effects of aircraft accidents. Such a degree of protection is probably impossible to achieve. Local situations may differ significantly from the assumptions and data upon which these guidelines are based and require individual study. Where it is desirable to restrict the density of development of an area, it is not usually possible to state that one density is safe and another is not. Safety is a relative term and the objective should be the realization of the greatest degree of safety that can be reasonably attained.

(2) Accident potential and clear zones (See § 256.7). (i) The area immediately beyond the end of a runway is the "Clear Zone", an area which possesses a high potential for accidents, and has traditionally been acquired by the Government in fee and kept clear of obstructions to flight.

(ii) Accident Potential Zone I (APZ I) is the area beyond the clear zone which possesses a significant potential for accidents.

(iii) Accident Potential Zone II (APZ II) is an area beyond APZ I having a measurable potential for accidents.

(iv) Modifications to APZs I and II will be considered if:

(A) The runway is infrequently used. (B) The prevailing wind conditions are such that a large percentage (i.e., over 80 percent) of the operations are in one direction.

(C) Most aircraft do not overfly the APZs as defined herein during normal flight operations (modifications may be made to alter these zones and adjust them to conform to the line of flight). (D) Local accident history indicates consideration of different areas.

(E) Other unusual conditions exist. (v) The takeoff safety zone for VFR rotary-wing facilities will be used for the clear zone; the remainder of the approach-departure zone will be used as APZ I.

(vi) Land use compatibility with clear zones and APZS is shown in § 256.8.

(d) Noise-(1) General. Noise exposure is described in various ways. In 1964, the Department of Defense began using the Composite Noise Rating (CNR) system to describe aircraft noise. Several years ago the Noise Exposure Forecast (NEF) system began to replace CNR. In August 1974, the Environment Protection Agency notified all Federal agencies of intent to implement the DayNight Average Sound Level (Ldn) noise descriptor, and this was subsequently adopted by the DoD. This Ldn system will be used for air installations. Where AICUZ studies have been published using the CNR of NEF systems or where studies have progressed to the point that a change in the descriptor system is impractical or uneconomical, such studies may be published and continued in use. However, in such cases, data necessary for conversion to Ldn should be collected and studies should be revised as soon as time and budgetary considerations permit. However, if State or local laws require some other noise descriptor, it may be used in lieu of Ldn.

(2) Noise Zones. (i) As a minimum, contours for Ldn 65, 70, 75 and 80 shall be plotted on maps as part of AICUZ studies.

(ii) See §256.10 for a further discussion of Ldn use and conversion to Ldn from previously used systems.

§256.4 Policy.

(a) General. As a first priority step, all reasonable, economical, and practical measures will be taken to reduce and/or control the generation of noise from flying and flying related activities. Typical measures normally include siting of engine test and runup facilities in remote areas if practical, provision of sound suppression equipment where necessary, and may include additional measures such as adjustment of traffic patterns to avoid

built-up areas where such can be accomplished with safety and without significant impairment of operational effectiveness. After all reasonable

noise source control measures have been taken, there will usually remain significant land areas wherein the total noise exposure is such as to be incompatible with certain uses.

(b) Compatible use land (1) General. (i) DoD policy is to work toward achieving compatibility between air installations and neighboring civilian communities by means of a compatible land use planning and control process conducted by the local community.

(ii) Land use compatibility guidelines will be specified for each Clear Zone, Accident Potential Zone, Noise Zone and combination of these as appropriate.

(iii) The method of control and regulation of land usage within each zone will vary according to local conditions. In all instances the primary objective will be to identify planning areas and reasonable land use guidelines which will be recommended to appropriate agencies who are in control of the planning functions for the affected areas.

(2) Property rights acquisition—(i) General. While noise generated by aircraft at military air installations should be an integral element of land use compatibility efforts, the acquisition of property rights on the basis of noise by the Department of Defense may not be in the long term best interests of the United States. Therefore, while the complete requirement for individual installations should be defined prior to any programming actions, acquisition of interests should be programmed in accordance with the following priorities.

(ii) Priorities. (A) The first priority is the acquisition in fee and/or appropriate restrictive easements of lands within the clear zones whenever practicable.

(B) Outside the clear zone, program for the acquisition of interests, first in Accident Potential Zones and secondly in high noise areas only when all possibilities of achieving compatible use zoning, or similar protection, have

been exhausted and the operational integrity of the air installation is manifestly threatened. If programming actions are considered necessary, complete records of all discussions, negotiations, testimony, etc., with or before all local officials, boards, etc., must be maintained. This will ensure that documentation is available to indicate that all reasonable and prudent efforts were made to preclude incompatible land use through cooperation with local governmental officials and that all recourse to such action has been exhausted. Such records shall accompany programming actions and/or apportionment requests for items programmed prior to the date of this part. In addition, a complete economic analysis and assessment of the future of the installation must be included.

(1) Costs of establishing and maintaining compatible use zones must be weighed against other available options, such as changing the installation's mission and relocating the flying activities, closing the installation, or such other courses of action as may be available. In performing analyses of this type, exceptional care must be exercised to assure that a decision to change or relocate a mission is fully justified and that all aspects of the situation have been thoroughly considered.

(2) When, as a result of such analysis, it is determined that relocation or abandonment of a mission will be required, then no new construction shall be undertaken in support of such activities except as is absolutely necessary to maintain safety and operational readiness pending accomplishment of the changes required.

(iii) Guidelines. This part shall not be used as sole justification for either the acquisition or the retention of owned interests beyond the minimum required to protect the Government.

(A) Necessary rights to land within the defined compatible use area may be obtained by purchase, exchange, or donation, in accordance with all applicable laws and regulations.

(B) If fee title is currently held or subsequently acquired in an area where compatible uses could be developed and no requirement for a fee interest in the land exists except to prevent incompat

ible use, disposal actions shall normally be instituted. Only those rights and interests necessary to establish and maintain compatible uses shall be retained. Where proceeds from disposal would be inconsequential, consideration may be given to retaining title.

(C) If the cost of acquiring a required interest approaches closely the cost of fee title, consideration shall be given to whether acquisition of fee title would be to the advantage of the Government.

(c) Rights and interests which may be obtained. When it is determined to be necessary for the Federal Government to acquire interests in land, a careful assessment of the type of interest to be acquired is mandatory. §256.9 contains a listing of possible interests which should be examined for applicability.

(d) Environmental impact statements. (1) Any actions taken with respect to safety of flight, accident hazard, or noise which involve acquisition of interests in land must be examined to determine the necessity of preparing an environmental impact statement in accordance with DoD Directive 6050.1, "Environmental Considerations in DoD Actions," March 19, 1974 (32 CFR part 214).

(2) All such environmental impact statements must be forwarded to appropriate Federal and local agencies for review in accordance with DoD Directive 6050.1 (32 CFR part 214).

(3) Coordination with local agencies will be in accordance with OMB Circular A-95.

§ 256.5 The air installation compatible use program.

(a) The Secretaries of the Military Departments will develop, implement and maintain a program to investigate and study all air installations in necessary order of priority to develop an Air Installation Compatible Use Zone (AICUZ) program for each air installation consistent wth § 256.4. AICUZ studies which contain an analysis of land use compatibility problems and potential solutions shall be developed and updated as necessary. As a minimum, each Study shall include the following:

(1) Determination by detailed study of flight operations, actual noise and safety surveys if necessary, and best

available projections of future flying activities, desirable restrictions on land use due to noise characteristics and safety of flight;

(2) Identification of present incompatible land uses;

(3) Identification of land that if inappropriately developed would be incompatible;

(4) Indication of types of desirable development for various land tracts;

(5) Land value estimates for the zones in question.

(6) Review of the airfield master plans to ensure that existing and future facilities siting is consistent with the policies in this part.

(7) Full consideration of joint use of air installations by activities of separate Military Departments whenever such use will result in maintaining operational capabilities while reducing noise, real estate and construction requirements.

(8) Recommendations for work with local zoning boards, necessary minimum programs of acquisition, relocations, or such other actions as are indicated by the results of the Study.

(b) Procedures. In developing AICUZ Studies the Secretaries of Military Departments shall:

(1) Follow the review and comment procedures established under OMB Circular A-95;

(2) Ensure that appropriate environmental factors are considered; and

(3) Ensure that other local, State or Federal agencies engaged in land use planning or land regulation for a particular area have an opportunity to review and comment upon any proposed plan or significant modification thereof.

(c) Coordination with State and local governments. Secretaries of the Military Departments shall develop procedures for coordinating AICUZ Studies with the land use planning and regulatory agencies in the area. Developing compatible land use plans may require working with local governments, local planning commissions, special purpose districts, regional planning agencies, state agencies, state legislatures, as well as the other Federal agencies. Technical assistance to local, regional, and state agencies to assist them in developing their land use planning and

regulatory processes, to explain an AICUZ Study and its implications, and generally to work toward compatible planning and development in the vicinity of military airfields, should be provided.

(d) Property rights acquisition. The AICUZ Study shall serve as the basis for new land acquisitions, property disposal, and other proposed changes in Military Departments real property holdings in the vicinity of military airfields where applicable.

(e) Required approvals. Based on the results of the AICUZ Studies, each Military Department will prepare recommendations for individual installations AICUZ programs for approval as follows:

(1) The Secretaries of the Military Departments or their designated representatives will review and approve the AICUZ Studies establishing the individual air installation AICUZ program.

(2) When relocation or abandonment of a mission or an installation is apparently required, the Secretaries of the Military Departments will submit the proposed plan for the installation, with appropriate recommendations, to the Secretary of Defense for approval.

(3) A time-phased fiscal year plan for implementation of the AICUZ program in priority order, consistent with budgetary considerations, will be developed for approval by the Secretaries of the Military Departments, or their designated representatives. These plans will serve as the basis for all AICUZ actions at the individual installations.

(f) Coincident actions. The Secretaries of the Military Departments will also take action to assure in accordance with § 256.4 (a) and (b) that:

(1) As the first priority action in developing an AICUZ program, full attention is given to safety and noise problems.

(2) In all planning, acquisition and siting of noise generating items, such as engine test stands, full advantage is taken of available alleviating measures, such as remote sites or sound suppression equipment.

(3) The noise exposure of on-installation facilities and personnel are considered together with that off the installation.

(4) There is development or continuation with renewed emphasis, of programs to inform local governments, citizens groups, and the general public of the requirements of flying activities, the reasons therefore, the efforts which may have been made or may be taken to reduce noise exposure, and similar matters which will promote and develop a public awareness of the complexities of air installation operations, the problems associated therewith, and the willingness of the Department of Defense to take all measures possible to alleviate undesirable external effects.

(g) Responsibilities for the acquisition, management and disposal of real property are defined in DoD Directive 4165.6, "Real Property; Acquisition, Management and Disposal," September 15, 1955 (20 FR 7113).

(h) The Deputy Assistant Secretary of Defense (Installations and Housing) will examine the program developed pursuant to this part, and from time to

time review the progress thereunder to assure conformance with policy.

§ 256.6 Runway classification by aircraft type.

Class A runways

S-2, VC-6, C-1, C-2, TC-4C, U-10, U-11, LU-16. TU-16, HU-16, C-7, C-8, C-12, C-47, C-117, U21, QU-22, E-1, E-2, 0-1, U-1, U-3, U-6, U-8, U-9, O-2, OV-1, OV-10, T-28, T-34, T-41, T42.

Class B runways

A-1, A-3, A-4, A-5, A-6, F-106, F-5, F-15, F-18, S-3, C-121, EC-121, WC-121, C-123, C-130, A7. A-38, AV-8, P-2, P-3, T-29, T-33, T-37, T39, T-1, HC-130B, C-131, C-140, C-5A, KC-97, F-9, F-14, F-4, F-8, F-111, T-2, T-38, B-52, B-57, B-57F, C-124, EC-130E, HC-130, C-135, VC-137, YF-12, SR-71, F-100, F-101, F-102, B-66, C-9, C-54, C-97, C-118, C-141, KC-135, EC-135, RC-135, U-2, F-104, F-105, C-119.

[42 FR 13022, Mar. 8, 1977]

§ 256.7 Accident potential zone guidelines.

[blocks in formation]

Width of clear zone may be based on individual service analysis of highest accident potential area for specific runway use and varied based on acquisition constraints. 3000 foot wide clear zone is desirable for new construction.