" The contractor must also preserve the roadway on which he is working from needless obstruction, and where necessary he must construct safe and commodious crossings, to be maintained in good order. He shall afford all proper and reasonable means for the... "
Highway Engineering - Pagina 137
door Charles Edward Morrison - 1908 - 315 pagina’s
Volledige weergave - Over dit boek

Annual Report of the Commissioner of Public Roads, Volume 8,Deel 1901

New Jersey. Commissioner of Public Roads - 1901 - 278 pagina’s
...they appear he will either lift or lower them, under the personal supervision of the engineer. 44. The contractor must also preserve the roadway on which he is working from needless obstructon, and where necessary he must construct safe and commodious crossings, to be maintained in...
Volledige weergave - Over dit boek

Annual Report of the Commissioner of Public Roads, Volume 9,Deel 1902

New Jersey. Commissioner of Public Roads - 1902 - 316 pagina’s
...anthorized by the engineer to remove the same. The contractor shall not disturb the position of title stones (the corners of properties adjacent to the road),...where they appear he will either lift or lower them, undor the personal supervision of the engineer. The contractor must also preserve the roadway on which...
Volledige weergave - Over dit boek

Annual Report of the Commissioner of Public Roads, Volume 10,Deel 1903

New Jersey. Commissioner of Public Roads - 1904 - 356 pagina’s
...the Engineer to remove the same. 45. The contractor shall not disturb the position of title stones (the corners of properties adjacent to the road),...lift or lower them, under the personal supervision ot the Engineer. 46. The contractor must also preserve the roadway on which he is working from needless...
Volledige weergave - Over dit boek

Annual Report of the Commissioner of Public Roads, Volume 12,Deel 1905

New Jersey. Commissioner of Public Roads - 1906 - 236 pagina’s
...made and established on the line of work until duly authorized by the engineer to remove the same. 40. The contractor shall not disturb the position of title-stones...them, under the personal supervision of the engineer. 41. The contractor must also preserve the roadway on which he is working from needless obstruction,...
Volledige weergave - Over dit boek

Annual Report of the Commissioner of Public Roads, Volume 13

New Jersey. Commissioner of public roads - 1907 - 214 pagina’s
...at the expense of the contractor. 48. The contractor shall not disturb the position of title stones (the corners of properties adjacent to the road),...also preserve the roadway on which he is working from needles obstruction, and where necessary he must construct safe and commodious crossings, to be maintained...
Volledige weergave - Over dit boek

Reports Presented to the General Assembly ..., Deel 2

Rhode Island - 1907 - 1310 pagina’s
...authorized by the engineer to remove the same. The contractor shall not disturb the position of title stones (the corners of properties adjacent to the road),...them, under the personal supervision of the engineer. ABANDONMENT OF CONTIIACT. 25. If at any time the work under contract should be abandoned, or if at...
Volledige weergave - Over dit boek

Biennial Report of the State Highway Commissioner, Volume 2

Michigan. State Highway Department - 1909 - 526 pagina’s
...so that he can properly locate and reset the same after the grading is complete. The contractor must preserve the roadway on which he is working from needless...obstruction, and where necessary he must construct safe and passable crossings and maintain them in good order. He shall afford all proper and reasonable means...
Volledige weergave - Over dit boek

Good Roads Magazine, Volume 8

1907 - 918 pagina’s
...so that he can properly locate and reset the same after the grading is complete. The contractor must preserve the roadway on which he is working from needless...obstruction, and where necessary he must construct safe and passable crossings and maintain them in good order. He shall afford all proper and reasonable means...
Volledige weergave - Over dit boek

Biennial Report

Michigan. State Highway Department - 1909 - 616 pagina’s
...so that he can properly locate and reset the same after the grading is complete. The contractor must preserve the roadway on which he is working from needless...obstruction, and where necessary he must construct safe and passable crossings and maintain them in good order. He shall afford all proper and reasonable means...
Volledige weergave - Over dit boek

Cyclopedia of Civil Engineering: A General Reference Work on ..., Volume 4

1920 - 432 pagina’s
...Engineer to remove the same. Title Stones. The Contractor shall not disturb the position of title stones (the corners of properties adjacent to the road), but where they appear he shall either lift or lower them, under the personal supervision of the Engineer. 319 Preserving Clear...
Volledige weergave - Over dit boek