The costs for cultural resources studies associated with the Selected Plan are estimated to be $1,375,000, as shown in Table 48.

[blocks in formation]

2.a.

Mapping, removal, and disposition of CSS GEORGIA ordnance

$200,000

[blocks in formation]

1.a.

1.b.

1.c.

Estimate for diver evaluation is based upon a projection of 20 targets at $10,000 per target.

Shoreline testing is based upon a projection of 6 resources at $25,000

per resource.

The old Fig Island channel 40-foot wide sloughing impact area, Station 62+650 to 63+500 (mile 11.9-12.0), is projected to contain 4 wrecks. The cost for testing and data recovery is $80,000 per wreck.

1.d. & 2.d. This estimate is based upon 2 person-years of effort at a GS-11, step 7, level. This includes contract scoping, negotiation and award, contract monitoring, and coordination with the Georgia and South Carolina State Historic Preservation Officers and the Advisory Council on Historic Preservation.

2.a.

The CSS GEORGIA estimate is based upon a projected recovery of 1,000 pieces of ordnance. This includes archaeological mapping, removal, temporary storage, and inerting and preservation of a representative sample. The remainder of the ordnance will be buried, live or inerted, or will be destroyed.

2.c. This estimate is based upon data recovery of two resources at $100,000 per resource.

Selected Plan Cost Summary

Table 49 present a summary of the estimated costs of the Selected Plan, which provides for deepening the harbor channel to 42 feet, the jetties channel to 42 feet, and the bar channel to 44 feet. It also includes deepening Kings Island Turning Basin and the Garden City and Ocean Terminals to 42 feet.

[blocks in formation]

FIRST COST

The estimated costs for Plan 1-40 and Plan 1-42 are shown in Tables 50 and 51. All costs, including engineering, design, supervision, and administration are based on actual experience for similar work in Savannah Harbor. Cost information is presented in the Microcomputer Aided Cost Estimate System (MCACES) format.

Based on present day construction prices, the first cost for the Selected Plan is $38,539,000. The first cost for the NED Plan, Plan 1-40, which must be used for the development of cost sharing, is $16,471,000.

ANNUAL COSTS

The estimated total investment first cost of $38,539,000, plus interest during construction, is equal to an average annual cost of $3,496,100, using interest and amortization over a 50-year project life at 8-1/2 percent.

BENEFIT/COST ANALYSIS

Table 52 presents the project first costs, annual costs, annual benefits, and benefit/cost ratio for the NED Plan (Plan 1-40) and the Selected Plan (Plan 1-42).

[blocks in formation]
[merged small][merged small][merged small][ocr errors][merged small][merged small]

REVIEWED & APPROVED BY: EARL P. COPPEDGE, P.E., BRANCH CHIEF

REVISED FEASIBILITY
REVISED FEASIBILITY STUDY

[blocks in formation]
[blocks in formation]
[blocks in formation]

$9,125,000 $914,000

10% $10,039,000

[blocks in formation]

ald SCHIEF, PROGRAMS MANAGEMENT

Potect W. Machen PROJECT MANAGER

DDE (PM)

[blocks in formation]

TOTAL FEDERAL COSTS ‒‒‒‒‒‒‒ $11,672,000
TOTAL NON-FEDERAL COSTS‒‒‒‒‒‒

$5,635,000

DIVISION APPROVED:

PROJECT DEPTH INNER HARBOR 40 FEET - BAR CHANNEL 42 FEET

CHIEF, COST ENGINEERING

DIRECTOR, REAL ESTATE

DIRECTOR, PLANNING

CHIEF, PROGRAMS MANAGEMENT DIRECTOR OF PPMD

[graphic]
[merged small][merged small][merged small][ocr errors][merged small]
[blocks in formation]

REVISED FEASIBILITY
REVISED FEASIBILITY STUDY

PREPARED BY: SAVANNAN DISTRICT

REVIEWED & APPROVED BY: EARL P. COPPEDGE, P.E., BRANCH CHIEF

TOTAL
EST COST

[blocks in formation]
[blocks in formation]
[blocks in formation]

SAVANNAN NARBOR DEEPENING STUDY
SAVANNAN HARBOR, GEORGIA
DATE PREPARED: 30 MARCH 1992

ACCOUNT

[ocr errors]

ESTINATED

NUMBER ITEM DESCRIPTION

12.

DREDGING

[blocks in formation]