Sidebilder
PDF
ePub
[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small][merged small]

South Carolina Human Affairs Commission

The Grant Services Unit, Office of the Governor is authorized to operate the South Carolina Project Notification and Review System (SCPNRS). Through the system the appropriate state and local officials are given the opportunity to review, comment, and be involved in efforts to obtain and use federal assistance, and to assess the relationship of proposals to their plans and programs.

Please review the attached information, mindful of the impact it may have on your agency's goals and objectives. Document the results of your review in the space provided. Return your response to us by the suspense date indicated above. Your comments will be reviewed and utilized in making the official state recommendation concerning the project. The recommendation will be forwarded to the cognizant federal agency.

If you have no comments, return of this form is still required.

If you have any questions, call me at (803) 734-0495.

Chin Nady

[graphic]
[merged small][merged small][merged small][ocr errors][merged small][merged small][merged small][merged small][merged small][merged small]

Resources

Governor's Div. of Energy, Agriculture and Nat. The Grant Services Unit, Office of the Governor is authorized to operate the South Carolina Project Notification and Review System (SCPNRS). Through the system the appropriate state and local officials are given the opportunity to review, comment, and be involved in efforts to obtain and use federal assistance, and to assess the relationship of proposals to their plans and programs.

Please review the attached information, mindful of the impact it may have on your agency's goals and objectives. Document the results of your review in the space provided. Return your response to us by the suspense date indicated above. Your comments will be reviewed and utilized in making the official state recommendation concerning the project. The recommendation will be forwarded to the cognizant federal agency.

If you have no comments, return of this form is still required.

If you have any questions, call me at (803) 734-0495.

Project is consistent with our goals and objectives

Request a conference to discuss comments

Chin Nalge

Chris Neeley

Please discontinue sending projects with this CFDA# to our office for review
Comments on proposed application is as follows:

(attach additional pages as necessary)

[merged small][merged small][ocr errors][ocr errors][merged small][merged small]
[blocks in formation]

Re: Certification in Accordance with Section 401 of the
Clean Water Act, as amended.

Savannah District, Corps of Engineers

Permit to deepen the Savannah Harbor channel and

Kings Island Turning Basin by 4 feet to an authorized depth
of -42 feet below the mean low water between stations 0+000
and 103+000, remove approximately 4,578,400 cubic yards of
sand/silt/clay material and place in the existing high
ground disposal areas. In addition, the bar channel would be
deepened to an authorized depth of 42 feet mlw between 0+000
and the end of the jetties and -44 feet mlw from station
14+00B to station 60+00B and remove approximately 2,346,100
cubic yards of predominately sandy material and place in an
existing USEPA approved ocean disposal area.

Savannah Harbor

Chatham County, Georgia and Jasper County, South Carolina

Dear Sir:

We have reviewed plans for this project and determined that there is a reasonable assurance that the proposed project will be conducted in a manner consistent with the Certification requirements of Section 401 of the Federal Clean Water Act, as amended. In accordance with the provisions of Section 401, we certify that this project, subject to the indicated conditions, is consistent with applicable provisions of Section 303 of the Federal Clean Water Act, as amended. We also hereby certify that there are no applicable effluent limitations under Sections 301(b) and 302, and that there are no applicable standards under Sections 306 and 307.

We reserve the right to impose additional conditions on this Certification to respond to specific problems which might arise and take enforcement actions necessary to ensure compliance with the State water quality standards.

If there are water quality problems in the Back River, Front River, Middle River, or Savannah River related to this work, the Department will request you identify the causes and take actions to eliminate future problems.

This Certification

1. Prior to or concurrent with dredging of the Savannanı

11134

Channel must be filled and the Back River tide gates removed from operation.

2. Best Management Practices to control erosion during and following
construction of dikes across New Cut Channel and the removal of the
tide gates from operation must be implemented.

3. All effluent from Disposal Area 12 must be discharged to the Back
River and none to the Wright River or its tributaries. Diversion of
all maintenance dredging effluent from Disposal Area 12 to the
Savannah Harbor side must be studied and the best means to divert all
effluent from Wright River determined. The SVCOE must submit a time
schedule for relocation of the weir structures at Disposal Area
12 to the Department prior to dredging of the Savannah Harbor.

4. Dredging of the Savannah Harbor must be limited, if possible, to the winter months (November 1 through March 1).

5. The SVCOE must implement the conditions listed in the EIS for the protection of manatees, sea turtles, and right whales during the dredging operation of the Savannah Harbor.

Sincerely,

Asta E. Saralines

Chester E. Sansbury, Director
Division of Water Quality

and Shellfish Sanitation

CES:NJNF

cc: Charleston District, Corps of Engineers
Low Country EQC District Office
SCCC

GADNR, David Word

[merged small][merged small][merged small][merged small][merged small][merged small][merged small][ocr errors][merged small][ocr errors][ocr errors][merged small][merged small][merged small]

The South Carolina Coastal Council has reviewed the Consistency Determination and supporting information for the disposal of dredged materials into Disposal Areas 12, 13, 14 and Jones/Oyster Bed Islands. The Council agrees with your determination that this activity is consistent with the South Carolina Coastal Management Program provided (1) that the dikes for Area 14 and Jones/Oyster Bed Islands are constructed from materials in the disposal areas such that the outside of the base extends only to the line shown on the plats submitted with the determination; (2) that the dikes are constructed before any additional spoil is deposited in Area 14 Jones/Oyster Bed Islands; and, (3) further, that no dredged materials are deposited in undiked areas of South Carolina and no dredged materials are allowed to flow into South Carolina marshes.

The Council appreciates the cooperation and significant effort on the part of the Savannah District Corps of Engineers in meeting the consistency requirements of the South Carolina Coastal Management Program. We look forward to working with you in the future.

[blocks in formation]
« ForrigeFortsett »