Congressional Serial SetU.S. Government Printing Office, 1994 |
Inni boken
Resultat 1-5 av 75
Side vi
... Kings Island Turning Basin Disposal of Dredged Material . Option for Disposal at Tybee Island .. Project Maintenance .. Cost Engineering ...... Cost Summary of Selected Plan 188 188 190 190 190 191 192 194 Report of the District ...
... Kings Island Turning Basin Disposal of Dredged Material . Option for Disposal at Tybee Island .. Project Maintenance .. Cost Engineering ...... Cost Summary of Selected Plan 188 188 190 190 190 191 192 194 Report of the District ...
Side xvii
... Kings Island Turning Basin during the period from February 1 to May 31 . That the dredging window and weir location issues be fully evaluated and resolved in the LINS Study . The proposed hopper dredging of the entrance channel be ...
... Kings Island Turning Basin during the period from February 1 to May 31 . That the dredging window and weir location issues be fully evaluated and resolved in the LINS Study . The proposed hopper dredging of the entrance channel be ...
Side xix
... Kings Island Turning Basin by 4 feet to an authorized depth of -42 feet below the mean low water between stations 0 + 000 and 103 + 000 , remove approximately 4,578,400 cubic yards of sand / silt / clay material and place in the ...
... Kings Island Turning Basin by 4 feet to an authorized depth of -42 feet below the mean low water between stations 0 + 000 and 103 + 000 , remove approximately 4,578,400 cubic yards of sand / silt / clay material and place in the ...
Side xxvii
... Kings Island Turning Basin , and deepening Kings Island Turning Basin from 38 to 42 feet . Additionally , authorization was issued pursuant to Section 1135 of the Water Resources Development Act of 1986 , as amended , to close New Cut ...
... Kings Island Turning Basin , and deepening Kings Island Turning Basin from 38 to 42 feet . Additionally , authorization was issued pursuant to Section 1135 of the Water Resources Development Act of 1986 , as amended , to close New Cut ...
Side 1
... Kings Island Turning Basin to -42 feet and the main Harbor Channel to -42 feet up to river mile 19.5 at Savannah Harbor . 3. Washington level review indicates that the recommended plan for deepening the Bar Channel , the Jetties Channel ...
... Kings Island Turning Basin to -42 feet and the main Harbor Channel to -42 feet up to river mile 19.5 at Savannah Harbor . 3. Washington level review indicates that the recommended plan for deepening the Bar Channel , the Jetties Channel ...
Innhold
292 | |
316 | |
318 | |
320 | |
330 | |
332 | |
336 | |
384 | |
95 | |
104 | |
125 | |
135 | |
158 | |
164 | |
185 | |
191 | |
196 | |
207 | |
212 | |
218 | |
227 | |
249 | |
257 | |
283 | |
390 | |
403 | |
411 | |
422 | |
428 | |
438 | |
453 | |
461 | |
464 | |
469 | |
Andre utgaver - Vis alle
Congressional Serial Set, Utgave 4049 United States. Congress. Senate. Committee on Foreign Relations Uten tilgangsbegrensning - 1901 |
Vanlige uttrykk og setninger
42 feet advance maintenance alternative amended annual Back River bar channel berthing channel deepening channel depth Chatham County Coastal Council construction Corps of Engineers cost crime CSS GEORGIA cultural resources data recovery developed diked District of Columbia draft dredged material economic estimated evaluation Federal feet mlw Front River funds Garden City Terminal GASHPO Georgia Ports Authority harbor channel Historic Preservation hopper dredging increase Island Turning Basin jetties channel Kings Island Turning located maintenance dredging Management marsh Navigation Project non-Federal ocean disposal offense operation percent proposed recommended relocation result right whales river mile salinity Savannah District Savannah Harbor Deepening Savannah River SCSHPO sea turtles Section 1135 project sediment basin Selected Plan ship shoaling South Carolina species Station striped bass subsection Table toxicity Tybee Island U.S. Army U.S. Highway 17 United States Code upstream vessels water quality weir widening Wright River
Populære avsnitt
Side 296 - Mitigation" includes: (a) Avoiding the impact altogether by not taking a certain action or parts of an action. (b) Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action.
Side 296 - Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action. (e) Compensating for the impact by replacing or providing substitute resources or environments.
Side 475 - America, find that the policies and actions of the Government of Iraq constitute an unusual and extraordinary threat to the national security and foreign policy of the United States and hereby declare a national emergency to deal with that threat.
Side 475 - States caused by the lapse of the Export Administration Act of 1979, as amended (50 USC App. 2401, et seq.), and the system of controls maintained under that Act. In that order I continued in effect, to the extent permitted by law, the provisions of the Export Administration Act of 1979, as amended, the Export Administration Regulations (15 CFR 768, et seq.