Congressional Serial SetU.S. Government Printing Office, 1994 |
Inni boken
Resultat 1-5 av 67
Side iv
... EVALUATION OF PROBLEMS AND NEEDS Needs and opportunities Study constraints ... Efficiency of Existing Harbor improvements .......... Impacts of Harbor operations on Harbor environment . Water Quality .... Tybee Island Beach Erosion ...
... EVALUATION OF PROBLEMS AND NEEDS Needs and opportunities Study constraints ... Efficiency of Existing Harbor improvements .......... Impacts of Harbor operations on Harbor environment . Water Quality .... Tybee Island Beach Erosion ...
Side v
... EVALUATION OF ALTERNATIVES Development and Evaluation of Alternatives ................................................... Introduction .... Summary of Screening of Alternatives .. Plans Eliminated from Further Study Plan 3 ...
... EVALUATION OF ALTERNATIVES Development and Evaluation of Alternatives ................................................... Introduction .... Summary of Screening of Alternatives .. Plans Eliminated from Further Study Plan 3 ...
Side vi
... Evaluation of Need for Ship Simulator Model 174 Predicted Shoaling and Bank Stability 175 Side Slope Stability 178 General 178 Impacts on Adjacent Lands and Structures .... Evaluation of Impacts and Design Considerations . 178 178 ...
... Evaluation of Need for Ship Simulator Model 174 Predicted Shoaling and Bank Stability 175 Side Slope Stability 178 General 178 Impacts on Adjacent Lands and Structures .... Evaluation of Impacts and Design Considerations . 178 178 ...
Side xxvii
... evaluation criteria . Sincerely yours , Heinz Wirele Heinz J. Mueller , Chief Environmental Policy Section Federal Activities Branch SAVANNAH HARBOR , GEORGIA REPORT OF THE CHIEF OF ENGINEERS xxvii Comments of the Environmental ...
... evaluation criteria . Sincerely yours , Heinz Wirele Heinz J. Mueller , Chief Environmental Policy Section Federal Activities Branch SAVANNAH HARBOR , GEORGIA REPORT OF THE CHIEF OF ENGINEERS xxvii Comments of the Environmental ...
Side 17
... evaluation of a small number of alternatives . During this phase , the alternatives were analyzed to a level of detail and refinement which assured that each plan considered was formulated to achieve the desired planning objectives , to ...
... evaluation of a small number of alternatives . During this phase , the alternatives were analyzed to a level of detail and refinement which assured that each plan considered was formulated to achieve the desired planning objectives , to ...
Innhold
292 | |
316 | |
318 | |
320 | |
330 | |
332 | |
336 | |
384 | |
95 | |
104 | |
125 | |
135 | |
158 | |
164 | |
185 | |
191 | |
196 | |
207 | |
212 | |
218 | |
227 | |
249 | |
257 | |
283 | |
390 | |
403 | |
411 | |
422 | |
428 | |
438 | |
453 | |
461 | |
464 | |
469 | |
Andre utgaver - Vis alle
Congressional Serial Set, Utgave 4049 United States. Congress. Senate. Committee on Foreign Relations Uten tilgangsbegrensning - 1901 |
Vanlige uttrykk og setninger
42 feet advance maintenance alternative amended annual Back River bar channel berthing channel deepening channel depth Chatham County Coastal Council construction Corps of Engineers cost crime CSS GEORGIA cultural resources data recovery developed diked District of Columbia draft dredged material economic estimated evaluation Federal feet mlw Front River funds Garden City Terminal GASHPO Georgia Ports Authority harbor channel Historic Preservation hopper dredging increase Island Turning Basin jetties channel Kings Island Turning located maintenance dredging Management marsh Navigation Project non-Federal ocean disposal offense operation percent proposed recommended relocation result right whales river mile salinity Savannah District Savannah Harbor Deepening Savannah River SCSHPO sea turtles Section 1135 project sediment basin Selected Plan ship shoaling South Carolina species Station striped bass subsection Table toxicity Tybee Island U.S. Army U.S. Highway 17 United States Code upstream vessels water quality weir widening Wright River
Populære avsnitt
Side 296 - Mitigation" includes: (a) Avoiding the impact altogether by not taking a certain action or parts of an action. (b) Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action.
Side 296 - Minimizing impacts by limiting the degree or magnitude of the action and its implementation. (c) Rectifying the impact by repairing, rehabilitating, or restoring the affected environment. (d) Reducing or eliminating the impact over time by preservation and maintenance operations during the life of the action. (e) Compensating for the impact by replacing or providing substitute resources or environments.
Side 475 - America, find that the policies and actions of the Government of Iraq constitute an unusual and extraordinary threat to the national security and foreign policy of the United States and hereby declare a national emergency to deal with that threat.
Side 475 - States caused by the lapse of the Export Administration Act of 1979, as amended (50 USC App. 2401, et seq.), and the system of controls maintained under that Act. In that order I continued in effect, to the extent permitted by law, the provisions of the Export Administration Act of 1979, as amended, the Export Administration Regulations (15 CFR 768, et seq.